Kohler generator instalation 20RESA — High res images be patient while loading.

Placed on stone pad 9/28/2012

generator stone pad

generator placement

generator 20-resa

Ran gas line 10/5/2012

generator natural gas line

gas line house to generator

Gas hookup to street 10/22/2012

CNG digging to connect gas

Gas meter hung 10/24/2012

CNG  gas meter install

Automatic Transfer Switch 10/19/2012

Wiring transfer switch

Kohler OnCue Software 10/25/2012

Internet software Kohler OnCue

Generator in-service date 10/25/2012
Generator actualized costs 9-10/2012

Purchase genset unit and transfer switch from APelectric.com 5200 delivered
Stone pad Rob Lodge Earthworks 290
Gas plumbing precisionmechanicalllc.com 1440
Aircraft shielded network cable from eBay 153
Wiring and install service entrance transfer switch Jim Tomko All Services Electric 2831

Notes:
Plumbing included hookup for gas stove and furnace.
Price of generator included carburetor heater and ATS status indicator.
Kohler onCue internet software with hardware key was supplied free of charge.